Skip to content
Hari Krishna Tex-Fab
Infrastructure & Capacities

General Export Infrastructure

Loading Ports & Ocean Freight

We handle both LCL (Less than Container Load) and FCL (Full Container Load) shipments. Our primary loading ports in India are Nhava Sheva (JNPT, Mumbai) and Mundra (Gujarat), ensuring multi-vessel weekly connectivity with major global carrier alliances.

Accepted Incoterms

To accommodate your company's logistics framework, we operate under ICC standard Incoterms 2020. We widely accept FOB (Free on Board), CIF (Cost, Insurance & Freight), and DDP (Delivered Duty Paid with local delivery).

Production & Dispatch Lead Times

Standard in-stock fabric orders are dispatched within 3–5 business days. Custom milling or specialized printing orders typically have a manufacturing lead time of 3–4 weeks prior to container stuffing and port transport.

Export-Grade Protective Packaging

Each fabric roll is inspected, rolled on heavy-gauge paper tubes, double poly-wrapped, and packed in moisture-resistant woven polypropylene or corrugated cartons for zero transit abrasion or moisture damage.